top of page
New Tong Operator .png

SERVICES

New Tong Operator .png
Power Tong Service

Utilizing only the best in tongs, handling tools and service personnel; PAR Energy Services can supply a full service tong operation from surface to production installs

  • Integral & Conventional Tongs​

  • Service diameter 1.5'' to 16''

  • Max torque of 45,000 ft.lbs

  • Tubular Handling Equipment

  • Buck on Services

CRT Operator.png
Casing Running Tools

The Volant CRTi and CRTe will allow the customer to rotate, circulate & reciprocate a casing string at maximum tubular pressure/tensile yields without comprimizing tubular performance

  • CRTi - 4.5'' - 16'' casing

  • CRTe - 4.5'' - 7 5/8''

  • 13,000 - 85,000 ft.lbs of torque

  • Drilling with Casing Capable

  • WeCatt Torque Sub

Computer torque employee.png
Computer Torque Monitoring 

When you've invested millions into your well, the last thing you want to question; is whether your expensive tubulars have been made up to the engineering specifications they were designed for. Computer Torque Monitoring will verify data and control tong torque and create a permanent record for that well.

  • Wincatt & AllTorque Standalone Systems

  • Torque Data Management System

  • Torque Turns Accuracy to less than 1%

  • Dump System Accuracy to less than 1%

Tally and inspection.png
API & Premium Thread Inspection & Casing Cleaning
  • Casing Steam Cleaning Systems

  • Vacuum Drifting

  • Laser Tally

  • API & Premium Thread Inspection

  • Rig Floor Casing Running Supervision

SERVICES
PAR Energy Employee.png

ABOUT

PAR Energy Services has been established as one of the leading tubular running service companies in Canada. 

Our projects and customers span from B.C to the Maritimes, and have covered operations in deep horizontal oil/gas wells,SAGD, shallow oil, cavern/disposal wells, Carbon Capture and Utility infrastructure operations. 

Today we operate a medium fleet of power tong and service trucks including a full line of casing and tubing running services from surface to production. 

PAR Energy prides itself by the employees that work here and the performance and integrity that each team member brings to the Company.

 

Safety performance is the #1 goal. We won’t do the work if we can’t do it safely. Doing is safe means that everyone goes home at the end of the day. This is our belief and our safety culture.

ABOUT
Chuckwagon Banner - Copy 4.png

Industry Links

Proud Sponsor of the Battle of the Rockies RMCA Event

Battle of the Rockies Chuckwagon.png

2005

Year Established

+3000

Projects Completed

10 Million +

Meters of Casing & Tubing Installed

0

Lost Time Incidents
PROJECTS

Safety & Compliance

CLIENTS

CONTACT

Inquiries

For any inquiries, questions or commendations, please call: 1(403)588-0674 or fill out the following form

Success! Message received.

Head Office

Office Address:

Bay 6, 7700 Edgar Industrial Drive

Red Deer, Alberta

T4P 3Y2

Mailing Address:

#112 6740 Johnstone Drive

Red Deer, Alberta

T4N 3Y2

 

sales@parenergyservices.com

Tel: 1(403) 588-0674

Employment

To apply for a job with PAR Energy, please send a cover letter together with your C.V. to: admin@parenergyservices.com

CONTACT

© 2026 PAR Energy Services Inc.

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • Google+ - Grey Circle
bottom of page